Problem
Prescriptive Opening Area Requirements
The NCC's Deemed-to-Satisfy (DTS) pathway prescribes minimum natural ventilation opening areas, including the 5% floor-area provision for applicable spaces.
While this provides a defined compliance pathway, meeting the prescribed opening area does not necessarily guarantee effective airflow distribution. Opening location, building geometry and operating conditions all influence ventilation performance.
Read more
While this provides a defined compliance pathway, meeting the prescribed opening area does not necessarily guarantee effective airflow distribution. Opening location, building geometry and operating conditions all influence ventilation performance.